Ticket #660, comment 1
initial v1 13 13 6. According to the building manager, the current electrical system is grandfathered in. Any minor changes such as re-arranging the breaker panel or upgrading small breakers to larger current load would likely trigger significant required upgrades... likely amounting to a full electrical over haul. 14 14 15 7. IF we want more current capacity for 220V circuits(of which we only have one 20Amp circuit for servers) we basically need to deal with 15 7. IF we want more current capacity for 220V circuits(of which we only have one 20Amp circuit for servers) we basically need to deal with upgrading the service to the building or resolving the split service situation in some other way.